How to make a pouring floors in the house yourself

During construction and repair, a very important stage is the preparation of the floor for the use of the finish coating. For these purposes, flood floors are perfectly suitable, which can provide an excellent result with minimum efforts.

Paul floor is a type of screed based on self -leveling mixtures. The use of such a screed does not require special skills, so to do this important work independently will be for the most part.

Depending on the composition of the mixture and technical characteristics, the flood floors can be divided into several types. Two main groups of self -leveling screed are the basis for the subsequent use of the flooring and the finish screed, which in itself is a flooring. In this case, the thickness of the pouring floor can be only 3.5 mm.

The basis for a self -leveling mixture can be cement, gypsum, polyurethane, epoxy resins. For residential premises, pouring floors based on cement or gypsum, followed by flooring, for example, laminate, parquet or tiles are more often used.

When choosing a self -leveling floor, it is worth paying attention to humidity in the room where it will be used. It is also necessary to determine how large the irregularities of the basic floor are. The choice of self -leveling screed will depend on these parameters.

In order to make the flood floors with your own hands, it is enough to have a desire to do it, which is perfectly evidenced by a video-master class on the Pol-Master portal. Com.

First you need to prepare the base. You need to make sure that the surface is cleaned of dust and substances that can weaken the hitch of the base with the mixture, for example, glue and fat spots. The joints and possible cracks must be processed and covered. After that, the entire base is covered with a construction primer. If a thick layer of the flood floor is applied for alignment, then when the primer dries, it is necessary to set the beacons using the construction level.

In order to distribute the self -leveling mixture, you can use the pump or do it manually. To get rid of air bubbles, you need to use a roller with spikes. Then the process of hardening the floor begins – here it is worth taking care so that there are no drafts and direct sunlight does not hit. The time required for hardening depends on the mixture and thickness of the layer. Information about this should be indicated on the label.

Subject to all the recommendations of a do -it -yourself floor floor will be a great basis for the further use of flooring. In the case of the use of the finished floor, the result will delight even the most demanding, because such floors have an attractive appearance and are unpretentious in care.

Related posts

Renovate where to start

allnews

Proper laying of the laminate

allnews

Torx doors

allnews